The Layout Of Plastic Pex Manifolds


Plastic PEX Manifolds, as a stable, comfortable, energy-saving and environmentally friendly air-conditioning system, has been loved by consumers in recent years.

Plastic PEX Manifolds, as a stable, comfortable, energy-saving and environmentally friendly air-conditioning system, has been loved by consumers in recent years. Therefore, Plastic PEX Manifolds has obtained rapid development and broad market prospects, and an important part of this system-Plastic PEX Manifolds tube, choosing the right Plastic PEX Manifolds tube is also very important for home life.
 

The Plastic PEX Manifolds system uses circulating fluid to flow in a closed Plastic PEX Manifolds tube to achieve heat exchange between the system and the ground, and utilize the renewable heat energy in the ground rock and soil. Since the deep stratum maintains a constant temperature all year round without interference, it is warm in winter and cool in summer compared with outdoor air temperature, so Plastic PEX Manifolds can overcome the technical obstacles of air source heat pumps and greatly improve the efficiency.

 

If the heat pump unit gives the flow requirement on the buried pipe side, or the heat load of the evaporator and the temperature difference requirement, we can calculate the pipe diameter according to the economic specific friction. If you feel that the flow rate of the pipe diameter selected according to the economic ratio is too large or too small, you can also adjust it artificially.

 

In the design work of the Plastic PEX Manifolds pipe buried pipe, it is important to pay attention to the way the pipeline is arranged. At present, the buried pipe can be divided into two ways: vertical buried pipe and horizontal buried pipe. For vertical buried pipes, the method of using this method to buried pipes relative to horizontal buried pipes does not take up much area. At the same time, the working stability of vertical buried pipes is relatively high. However, compared with horizontal buried pipes, the required cost It is also higher, so when choosing this method of construction, you need to consider the price factor.

 

Poly PEX Fittings horizontal buried pipes, using this method for buried pipes requires a relatively large construction area, because the laying of pipes takes up a large area, so there are high requirements for the construction environment. However, the use of horizontal buried pipes has the advantage of low cost, so many people use this method.